Torrence Ford Park
Torrence Ford consisted of two Industrial Warehouses totaling 235,000 SQFT. GC: Evans General Contractors
Torrence Ford consisted of two Industrial Warehouses totaling 235,000 SQFT. GC: Evans General Contractors
New construction middle school located in Fort Mill, SC. This 160,000 square foot project includes new construction of a three (3) level. The project also includes athletic fields and Extensive Site Lighting and Pedestrian Poles.
Woodland Heights Project was a 100,000 SQ FT Addition to an existing elementary school in Mooresville NC.
The Rock Hill Sports & Event Center is the sports hub of Rock Hill. The 170,000 sq. ft. facility is part of a mixed-use site connecting Winthrop University to Old Town Rock Hill, restaurants, outdoor venues, office space, apartments and more. The Center will host city athletic programs, sports tournaments, conferences/conventions, concerts, and other special
Hickory Ridge Elementary is a 125,000 Sq ft School that has multiple wings and levels. Along with the GC Leitner Construction, Qwest was able to help build this state of the art school.
Qwest Electric was proud to be part of a project that encompassed two large scale industrial warehouses. With a total Square footage of over 300,000. Project Manager- Landon Bullock Project Superintendent – Bob Ward
Qwest Electric completed this project with trusted partner Myers and Chapman. This project entailed a four story class A office space with cutting edge LED Lighting & Controls along with a 4 story Parking Deck.
Qwest Electric Completed the Historic Lowenstein Upfit with General Contractor J.M. Cope. This Project entailed up- fitting a textile Mill Into a Class-A office space, and building a brand New parking garage.
This 5,000 acre design build gold mine project for Oceana Gold started in 2016 with J.M Cope and is currently still expanding. Electrical infrastructure included over 2,000’ of 35KV cable in 6” concrete encased conduit, 3 concrete manholes, one 750KV and one 300KVA transformers. Multiple support buildings included a 36,000 square foot Administration Building,
Qwest Electric LLC was selected by Graycor Construction to provide $3,000,000.00 in LED lighting and power upgrades to this 1.4 million square foot shopping mall in 2016. This renovation was completed in the evening and morning hours so as to not interrupt customer services.